Rule 31
Magnetic and Gravitational Survey
: (1) In relation to Magnetic and Gravitational Survey, the contractor shall submit the following to the Department:
(a) Flight route maps at 1:50,000 and 1:250,000 values.
(b) Aerial magnetic recording tape.
(c) Daily record of Earth's magnetic field (magnetic field).
(d) Description of equipment used in magnetic and gravity survey work.
(e) Sections (a), (b) along with values used by the contractor in transparent and paper print along with 1:50,000 and 1:250,000 maps of geological formations and maps showing depth and magnetic and gravity effects (intensity) of the lower part (vesment) and (c) a report on the consideration of .
(2) The report regarding clauses (a), (b), (c) and (d) shall be submitted within thirty (30) days of the completion of the magnetic and gravity survey work and the report regarding clause (e) within ninety (90) days of the completion of such work. will have to do.
(a) Flight route maps at 1:50,000 and 1:250,000 values.
(b) Aerial magnetic recording tape.
(c) Daily record of Earth's magnetic field (magnetic field).
(d) Description of equipment used in magnetic and gravity survey work.
(e) Sections (a), (b) along with values used by the contractor in transparent and paper print along with 1:50,000 and 1:250,000 maps of geological formations and maps showing depth and magnetic and gravity effects (intensity) of the lower part (vesment) and (c) a report on the consideration of .
(2) The report regarding clauses (a), (b), (c) and (d) shall be submitted within thirty (30) days of the completion of the magnetic and gravity survey work and the report regarding clause (e) within ninety (90) days of the completion of such work. will have to do.